We’re in the commissioning phase of the crane and transport system for the storage of theatrical scenery for Bavarian opera, with our contractor RIKO. The theatrical scenery is stored in special 9,7m x 2,3m x 2,7m containers. The containers are transported via automated conveyors and a storage-retreival machine to a warehouse with 450 places. The 47-ton crane with an electrical installed power of 117kW can pick-up and drop-off the 6-ton containers using a satellite.
The project is an extension of an existing warehouse, so the existing cranes were a base for the design. The crane was mechanically and electrically re-engineered, and installed near München, Germany. It’s currently in the commissioning phase.
Customer: Bavarska opera
Partner: RIKO d.o.o.
Field of work: Logistic systems
Year: 2023
Scope:
- Design
- Manufacturing
- Assembly
- Software on PLC level
- Commissioning